Project info

On February 3, 2023, Fusiontek installed four EV car charging stations for Strickland MFG. The installation was completed in just two days, demonstrating the efficiency and professionalism of the Fusiontek team. As always, we made sure to prioritize safety and quality in every step of the process, ensuring that the charging stations were installed to the highest standards. We worked closely with the client to assess their specific needs, and developed a plan that met those requirements precisely. This allowed us to deliver a customized solution that perfectly met the client's expectations. Strickland MFG was impressed with our work and expressed their satisfaction with the end result.

Project info

  • Date: Feb 03, 2023
  • Client: Strickland MFG. Zapcharged.
  • Category:
  • Address: Enterprise Way, Vale Park, Evesham WR11 1AA

Strickland MFG. Zapcharged.

O On February 3, 2023, Fusiontek installed four EV car charging stations for Strickland MFG. The installation was completed in just two days, demonstrating the efficiency and professionalism of the Fusiontek team. As always, we made sure to prioritize safety and quality in every step of the process, ensuring that the charging stations were installed to the highest standards. We worked closely with the client to assess their specific needs, then developed a plan that met those requirements precisely. This allowed us to deliver a customized solution that perfectly met the client's expectations. Strickland MFG was impressed with our work and expressed their satisfaction with the end result.

Our Project Overview

Installation Time

Installation Time

Installation was completed in just two days, which left the client pleasantly surprised by the short timeframe.
Charge Points

Charge Points

4 EV charging stations were installed.
Fast Charge

Fast Charge

Four medium charging stations were installed.The client did not require fast charging stations.
Quality Service

Quality Service

An on-site inspection was conducted to ensure quality.

Summary Results

Our client expressed a desire to install EV car charging stations in an area with existing asphalt, while minimizing any impact on nearby trees. This was a unique challenge, but Fusiontek was up for the task. We developed a specialised installation plan that took into account the existing asphalt and the need to protect nearby trees. By working closely with the client, we were able to come up with a solution that met their needs and also minimised the environmental impact. We utilised specialised equipment and techniques to ensure the installation was completed with minimal disruption to the trees and surrounding area. The client was thrilled with the result, and appreciated Fusiontek’s commitment to providing sustainable solutions.